Civil Engineering
Top plate
It’s necessary to unite footing concrete and side walls of steel pipe sheet pile on the steel pipe sheet pile foundation.
Conventionally, method to weld plate to steel pipe sheet pile at site and method to make a hole through the steel pipe sheet pile and insert steel bar into it have been adopted.
NSW stud construction method is a method to weld stud directly to steel pipe sheet pile by using deformed bar stud which has good weldability and arc shield which has good stability and by monitoring welding result at any time.
Tokyo branch office: 81-(0)44-589-9515
Chubu branch office: 81-(0)566-45-5241
Osaka branch office: 81-(0)6-6385-2332
Chugoku branch office: 81-(0)82-532-1785